Name: FinFly ISP

Text: FINFISHER: FinFly ISP Project
FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
“Turkmenistan”
Preconditions and Requirements
Installation &
Commissioning

1

Assumptions, Preconditions and
Requirements

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
2

TABLE OF CONTENT

1 General.................................................................................................................... 3
2 Co-Operation Duties................................................................................................ 3
3 Project Assumptions, Limitations and PreConditions............................................... 4
3.1 General.............................................................................................................. 4
3.2 Technical Details............................................................................................. 12
3.2.1 Project Overview....................................................................................... 12
3.2.2 Turkmen Telecom (fixed Network)............................................................ 14
3.2.3 TMCell (mobile Network)........................................................................... 16
3.2.3.1 HUAWEI Domain.................................................................................. 16
3.2.3.2 NSN Domain........................................................................................ 18
3.2.4 Office / LEMF............................................................................................. 20
3.2.5 All FinFly ISP Locations.............................................................................. 21
3.3 Final Acceptance Tests (Test Equipment)........................................................ 22
3.4 FinFly ISP Training........................................................................................... 23

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
3

1 GENERAL
The Preconditions and Requirements listed in this document have to be fulfilled
and/or confirmed either prior to delivery of the FinFly ISP equipment, in a time
period before installation will start or latest during the installation phase of the
project itself.
Some of the requirements will make it a necessity to have an on-site survey prior to
delivery to ensure that preconditions and assumptions are fulfilled and didn’t
change during the last months and to get a common understanding between all
parties involved in this project.

2 CO-OPERATION DUTIES
For the FinFly ISP Project, Gamma Group assumes the following co-operation and
project support on the part of the client (the customer and/or Elaman GmbH):
No
.

Requirements / Preconditions /
Assumption

2.1

The client will make available
document templates and
information necessary for the
execution of the work
The client will inform parties
involved in the project about the
upcoming work
The client will organize all
necessary information, accesses
and entries that are required for
the workflow of the project
The client will organize meetings
and establish contact with the
parties involved
The client will make available the
network connections (minimum
FE; GE Fiber is assumed for this
project) and the network
between the all FinFly ISP
Appliances deployed in the two
different Networks and at the
LEMF
The client will make available
sufficient network connections
for the delivered components
The client will make available
housing space for the delivered
turn-key solutions (Server Racks)
and appropriate power
connections

2.2

2.3

2.4

2.5

2.6

2.7

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installatio
n

Site
Survey
necessar
y

X
X
X
X

X

X

X

X

X

X

X

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
4

2.8

2.9

The client will organize the
transport of staff and material
during installation, testing and
training.
The client will organize all
additional test equipment for the
Final Acceptance Test / End-2End Tests

X

X

3 PROJECT ASSUMPTIONS, LIMITATIONS AND
PRECONDITIONS
3.1 General
The System(s) to be deployed in this project can only INFECT international traffic of
ADSL, dial-up and the fixed IP-Address broadband subscribers in Turkmen Telecom
network and Mobile Subscribers using a Notebook / PC as the terminal to access the
Internet via the Gateways between the Mobile Network Provider TMCell and
Turkmen Telecom.
The project was offered with the following assumptions, limitations and
preconditions. The following preconditions must be fulfilled by the client (the
customer and/or Elaman GmbH):
1. The client will forego all assertion of claims on account of any possible adverse
effects and/or damages that may arise in connection with the assignment.
Reserved are damages that arise through serious negligence or deliberate
actions or omissions by the staff of Dreamlab and/or Gamma.
2.

The current approach covers the mobile and fixed networks of the country of
Turkmenistan (TMCell and Turkmen Telecom).
Until now relevant information for this project are not 100% available and/or
certain. Therefore the following assumptions have been used:

These Limitations and Requirements listed in the following chapters I, II (II A and II
B) below are pre-conditions which apply to this project. If during the course of the
on-site survey and/or installation some of the above named preconditions and
limitations are not fulfilled Gamma and Dreamlab reserve the right to treat the work
linked to such missing preconditions as change requests to this project.

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
5

I.

Turkmen Telecom (fixed Network)

We refer positioning to the graphic “Turkmen Telecom Network Infrastructure
Overview” with the
Cartesian Coordinates on the following page and the two network traces
(Turkmentel.pcap,
Turkmentel2.pcap). We assume that the traffic sample Turkmentel.pcap has
been taken on the
links between 2950 (D6) and 2960 or NAT in (C/D 3).

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
6

to 2960 without
any impact on the
FinFly ISP Project

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
7

a) All NATed customer traffic flows through the links between 2950 (D6) and
2960 or NAT in (C/D 3)
b) All non NATed customer internet traffic flows though the link 2950 (D6)
and Satgate (A7).
c) All dynamic IP's are solely provisioned via RADIUS.
d) All RADIUS traffic flows through the link between 2950 (D6) and 2960 or
NAT in (C/D 3)
e) The only RADIUS dialog that is provisioning dynamic IP addresses is shown
in the Turkmenistan.pcap in packet number 7 and 8. The property to set
IP's is “FRAMED-IP-Address”. A sample for a failed Access-Request is
documented in packet 5 and 6 in the same trace file.
f) If there are more RADIUS dialog variants they will be documented and
outlined by the provider.
g) We assume there is no other or more dynamic IP provisioning mechanisms
in place.
h) All fixed IP address traffic flows through the link 2950 (D6) and Satgate
(A7).
i) All links are based on copper medium and support 10/100/1000 Mbps
Ethernet.

We have found non internal source IP-Addresses in the Turkmentel.pcap
sample and need an
explanation how this is possible.
Please do precisely document any additional information, differences,
amendments or comments.

Preconditions / Requirements:
No
.

Requirements / Preconditions /
Assumption

Prior to
Delivery

Before
Installatio

Latest
during

Site
Survey

fulfilled
Date/Signat

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
8

n
starts
3.1

I

Confirm that everything listed
above
a) – i) is correct and unchanged

X

Installatio
n

necessar
y

X

ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
9

II.

TMCell (mobile Network)

The TMCell network delivers mobile IP services and is split in a Huawei and a
NSN domain.
Both domains maintain one active and one passive link in between the SGSN
and the GGSN.

Huawei domain:

A)

a) The Huawei domain's network is based on copper 10/100/1000 Mbps
Ethernet media
b)

The dynamic IP's of targets are provisioned on the Gn-Interface. The traffic
sample TMCell_Huawei_SGSN-Gn-1_active.pcap contains all provisioning
mechanisms.

c) The mechanism for provisioning is showed in file TMCell_Huawei_SGSN-Gn1_active.pcap in packet 1548 and 1560. The unique target identifier can be
the IMSI or the MSISDN (phone number). In this sample the mobile target
receives the IP address 172.16.190.73.
d)

All subsequent mobile IP traffic from the target is as well flowing through
the same Gn-Interface found in TMCell_Huawei_SGSN-Gn-1_active.pcap.

e)

The same mobile IP traffic flows through the Gi-Interface found in
TMCell_Huawei_GGSN-Gi-2_active.pcap without GTP encapsulation.

f)

All mobile IP traffic is flowing through the Gn- and Gi-Interfaces on the
active and upon failure the passive link.

g)

The TMCell_Huawei_SGSN-Gn-1_active.pcap traffic sample has been sniffed
on the links between the SGSN and the GGSN.

h)

The TMCell_Huawei_GGSN-Gi-2_active.pcap traffic sample has been sniffed
on the links between the GGSN and nsnfw01 and nsnfw02.

Preconditions / Requirements:
No
.

Requirements / Preconditions /
Assumption

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installatio
n

Site
Survey
necessar
y

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
10

3.1

II
A

Confirm that everything listed
above
a) – h) is correct and unchanged

X

X

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
11

NSN domain:

B)
a)

The NSN domain's network is based on Fiber 1 Gbps Ethernet media

b)

The dynamic IP's of targets are provisioned on the Gn-Interface. The traffic
sample TMCell_NSN_01-09Gn-1.pcap contains all provisioning mechanisms.

c) The mechanism for provisioning is showed in file TMCell_NSN_01-09Gn1.pcap in packet 532 and 533. The unique target identifier can be the IMSI
or the MSISDN (phone number). In this sample the mobile target receives
the IP address 172.19.8.243.
d) All subsequent mobile IP traffic from the target is as well flowing through
the same Gn interface found in TMCell_NSN_01-09Gn-1.pcap.
e)

The same mobile IP traffic flows through the Gi-Interface found in
TMCell_NSN_01-09Gi-1.pcap without GTP encapsulation.

f)

All mobile IP traffic is flowing through the Gn- and Gi-Interfaces on the
active and upon failure the passive link.

g) The TMCell_NSN_01-09Gn-1.pcap traffic sample has been sniffed on the
links between the SGSN and the GGSN
h)

The TMCell_NSN_01-09Gi-1.pcap traffic sample has been sniffed on the
links between the GGSN and nsnfw01 and nsnfw02.

Preconditions / Requirements:
No
.

Requirements / Preconditions /
Assumption

3.1

Confirm that everything listed
above
a) – h) is correct and unchanged

II
B

Prior to
Delivery

X

Before
Installatio
n
starts

Latest
during
Installatio
n

Site
Survey
necessar
y

X

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
12

3.2 Technical Details
3.2.1

Project Overview

The following graphic shows an overview of the project setup:

1 Gbps Ethernet Fiber
1000BASE-LX, Single
Mode, 1310nm

SC Connectors

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
13

Preconditions / Requirements:
The customer has to provide the two (2) network connections (red lines) between

No.
3.2.
1

1

3.2.
1

2

Requirements / Preconditions /
Assumption
TMCell and Turkmen Telecom
1 Gbps Ethernet COPPER
(1000BASE-T; RJ45 / 8P8C
Connectors

Turkmen Telecom and Office
/LEMF
1 Gbps Ethernet Single Mode
FIBER (1000BASE-LX 1310nm;
SC-Connectors)

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installatio
n

Site
Survey
necessar
y

X

X

X

X

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
14

3.2.2

Turkmen Telecom (fixed Network)

The following graphics shows the relevant parts of the Turkmen Telecom fixed
network used for the FinFly ISP Project:

to 2960 without
any impact on the
FinFly ISP Project

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
15

Preconditions / Requirements:
The three (3) links FinFly ISP has to be connected to (1, 2, 3 – blue stars) are:

No.
3.2.
2

1

3.2.
2

2

Requirements / Preconditions /
Assumption
either 100 Mbps Ethernet
COPPER
(1000BASE-T; RJ45 / 8P8C
Connectors)

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installatio
n

Site
Survey
necessar
y

X

X

X

X

or 1 Gbps Ethernet COPPER
(1000BASE-T; RJ45 / 8P8C
Connectors)

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
16

3.2.3

TMCell (mobile Network)

3.2.3.1 HUAWEI Domain
The following graphics shows the relevant parts of the Huawei Domain of the TMCell
mobile network used for the FinFly ISP Project:

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
17

Preconditions / Requirements:
The two (2) links FinFly ISP has to be connected to (1, 2 – blue stars) are:

No.
3.2.3
.1

1

3.2.3
.2

2

Requirements / Preconditions /
Assumption

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installati
on

Site
Survey
necessar
y

Active 1 Gbps Ethernet Single
Mode FIBER (1000BASE-LX
1310nm;
LC-Connectors)

X

X

Failover 1 Gbps Ethernet
Single Mode FIBER (1000BASELX 1310nm;
LC-Connectors)

X

X

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
18

3.2.3.2 NSN Domain
The following graphics shows the relevant parts of the NSN Domain of the TMCell
mobile network used for the FinFly ISP Project:

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
19

Preconditions / Requirements:
The two (2) links FinFly ISP has to be connected to (3, 4 – blue stars) are:

No.
3.2.3
.2

1

3.2.3
.2

2

Requirements / Preconditions /
Assumption

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installati
on

Site
Survey
necessar
y

Active 1 Gbps Ethernet
COPPER (1000BASE-T; RJ45 /
8P8C Connectors)

X

X

X

X

Failover 1 Gbps Ethernet
COPPER (1000BASE-T; RJ45 /
8P8C Connectors)

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
20

3.2.4

Office / LEMF

The following graphics shows an overview of the Office / LEMF location for the FinFly
ISP Project:

1 Gbps Ethernet Fiber
1000BASE-LX, Single
Mode, 1310nm

SC Connectors

Preconditions / Requirements:
For the Monitoring and Alarming Server it must be ensured that:

No.
3.2.
4

Requirements / Preconditions /
Assumption

3

Latest
during
Installatio
n

X

Email Address(es) have to be
provided to send Alarm-Emails

X

GSM-coverage is available on
location to send Alarm-SMS

X

2
3.2.
4

Before
Installatio
n
starts

An Internet connection is
available to send Alarm-Emails

1
3.2.
4

Prior to
Delivery

Site
Survey
necessar
y

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
21

3.2.
4

4

Two (2) SIM-Cards of two (2)
different Providers (if possible)
have to be provided to send
Alarm-SMS
ONLY 1 SIM-Card will be
provided, because there is
only 1 Mobile Provider

3.2.5

X

All FinFly ISP Locations

At all locations there must be appropriate amount of space provided for:

No.
3.2.
5

1
3.2.
5

2

Requirements / Preconditions /
Assumption

Prior to
Delivery

Space for Server Racks provided
(Turkmen Telecom, TMCell and
Office / LEMF

Before
Installatio
n
starts

Latest
during
Installatio
n

X

Space for FinFly ISP
Management Workstation with
two (2) 24”-TFT Displays,
Keyboard, Mouse

Site
Survey
necessar
y

fulfilled
Date/Signat
ure

X
X

For all FinFly ISP locations it has to be decided by the customer, what kind of Power
Plugs have be delivered to connect the Server Racks (UPS), the Switches and the
Management Workstation.

No.
3.2.
5

Requirements / Preconditions /
Assumption
Type B
(American 3-pin)

3
3.2.
5

4
3.2.
5

5
3.2.
5

6

Type F
(Schuko 2-pin)



Type G
(British 3-pin)

All FinFly ISP Sites must provide
200 – 240 V AC @ 50/60 Hz
16 Ampere / 3.000 Watt

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installatio
n

Site
Survey
necessar
y

X

X

X

X

X

X

X

X

fulfilled
Date/Signat
ure

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
22

Remarks:
All FinFisher Products (except FinFly ISP) will be delivered with Power Plugs “Type
G” and appropriate Adapter Sets to fulfill worldwide requirements.

3.3 Final Acceptance Tests (Test Equipment)
Gamma and Dreamlab assume the presence of the following, permanently installed
and operational Test Equipment at the Office / LEMF location for Final Acceptance
Testing:

Preconditions / Requirements:

No.
3.3

1
3.3

2
3.3

3

3.3

4

Requirements / Preconditions /
Assumption
Test Target laptop and/or
desktop with configured
Windows Operating System, to
be used for Infection
xDSL-link with configured Router
and Internet Access via Turkmen
Telecom for the Test Target(s)
mentioned above
Dial-up connection with internet
access via Turkmen Telecom,
including valid credentials and a
dial-up modem for the Test
Target(s) mentioned above
Mobile Internet Access via
TMCell for the Test Target(s)
mentioned above

Prior to
Delivery

Before
Installatio
n
starts

Latest
during
Installatio
n

Site
Survey
necessar
y

fulfilled
Date/Signat
ure

X

X

X

X

Regarding the location / the room for the Final Acceptance Tests pls. see the next
chapter 3.4 “Training”

FinFly ISP Project “Turkmenistan” – Install. & Comm. Assumptions,
Preconditions and Requirements
23

3.4 FinFly ISP Training
A five (5) days Training is part of the project and will be performed after the Final
Acceptance Document is signed by all parties. The training will cover technical and
operational topics for the FinFly ISP System and the Monitoring & Alarming System.

Preconditions / Requirements:
No.
3.4

1
3.4

2
3.4

3
3.4

4
3.4

5
3.4

6
3.4

7
3.4

8
3.4

Requirements / Preconditions /
Assumption
A maximum of six (6) students will participate in
the trainings
The Test Equipment listed in chapter 3.3 above
with all listed Internet connections has to be kept
available for the training
Appropriate seating and desk space for up to 6
students
At least one of the following should be available in
the room – flipchart, whiteboard and / or
interactive whiteboard
Suitable heating / air conditioning system must be
available in the classroom
Adequate lighting must be available in classroom
and blinds should be available if necessary to
reduce glare on projector screen
Trainer will need full details of the fire evacuation
procedure in the building
Health and Safety considerations must be
observed e.g. trailing cables etc.
A LCD Projector / Beamer is required

9
3.4

10
3.4

11
3.4

12

A writing pad and ball pen for each student is
required
Hot and cold drinks should be provided for
student breaks and ideally served near the
classroom to prevent delays
Lunch should be provided and again ideally
served near to the classroom to prevent delays in
returning to class

After Installation

X
X
X
X
X
X
X
X
X
X
X
X

fulfilled
Date/Signature

Document Path: ["790-gamma-group-installation-guide-finfly-isp.pdf"]

e-Highlighter

Click to send permalink to address bar, or right-click to copy permalink.

Un-highlight all Un-highlight selectionu Highlight selectionh